Health Impact Assessment Vientiane Wastewater Treatment Plant
Client
Sustainable Society Agriculture Forestry and Environment Consult (SSAFE) in associate with LAOPROJEKT PLC (Vientiane Wastewater Treatment of the Hungarian Water Lao Project Consortium).
Location
Vientiane Capital, Lao PDR
Project Duration
May 2022 – September 2022
Background
ESL Sole Company Limited (ESL) is pleased to submit the Proposal on conducting a Health Impact Assessment for Vientiane Wastewater Treatment of the Hungarian Water Lao Project Consortium (The “Project”).
The Project is a long-term development project, and we assume the construction takes year to complete. Therefore, it is necessary to conduct HIA at the early stage of the project to ensure the potential health impacts are known and prevention and mitigation measures are in place.
Services Provided
ESL conducted the HIA study. The services include screening/scoping to identify the type of HIA needed to conduct, baseline study with primary and secondary data collection, risk assessment, impact identification and assessment, prevention and mitigation measures, and health management and monitoring plans. ESL also conduct the public consultation at a district/provincial level and technical meeting to obtain feedbacks from health authorities and address them into the final report to be approved by the Ministry of Health.