Environmental Impact Review for Detailed Feasibility Study for Upgrading National Road No.8 on the Asian Highway (AHI5) Network in the Lao PDR.
Client
Dongsung Engineering/Dongil/Dasan Consultants
Location
Bolikhamxay and Khammouan Provinces, Lao PDR.
Project Duration
October 2017 – July 2018
Background
The Upgrading National Road No 8 (NR-8), in other name the Asian Highway (AH15) Network in Lao PDR, or the Project is located in Bolikhamxay and some part of Khammouan province with the total length of 130.3 km from Vieng Kham – Lak Sao and Nam Phao (Vietnam border). The Project Implementing Agency is Korea International Cooperation Agency (KOICA) with collaboration of Ministry of Public Works and Transport of Lao PDR (MPWT).
Services Provided
ESL provided the Environmental Impact Review during the design of the Project. (This EIR serves different objectives from the Initial Environmental Examination (IEE) or Environmental Impact Assessment (EIA) which in this case it requires simple approaches on impact assessment for environment components of the Project. Scope of the study includes the following:
- – Regulations reviews;
- – Basic information on physical component, biological component and social component;
- – Impact identification and assessment;
- – Recommendation to the detail design.