Health Impact Assessment (HIA) for Xekong Thermal Power Plant Project

Home / Health Impact Assessment (HIA) for Xekong Thermal Power Plant Project

Health Impact Assessment (HIA) for Xekong Thermal Power Plant Project.

 

Client

Xekong Thermal Power Plant Company Limited.

 

Location

Kaleum District, Xekong Province

 

Project Duration

March 2020 – May 2021

 

Background

Health Impact Assessment is conducted for Xekong Mine Mouth Thermal Power Plant Project in Kaleum district, Xekong province. the Project is required to prepare a conceptual Mine Closure Plan (“MCP”) that will be submitted together with the feasibility study report to the Ministry of Energy and Mine (“MEM”) for their consideration and approval

 

Services Provided

ESL conducted the HIA study in 2020.  The services include screening/scoping to identify the type of HIA needed to conduct, baseline study with primary and secondary data collection, risk assessment, impact identification and assessment, prevention and mitigation measures, and health management and monitoring plans. ESL also conduct the public consultation at a district/provincial level and technical meeting to obtain feedbacks from health authorities and address them into the final report to be approved by the Ministry of Health.

Leave a Reply

Your email address will not be published.