Mine Closure Plan Xekong Coal Mine Phonesack
Mine Closure Plan for Xekong Coal Mine
Client: Xekong Thermal Power Plant Company Ltd
Location: Salavan and Xekong Provinces, Lao PDR
Duration: April 2020 – August 2020
Company Background:
The Coal Mine Project is operated by Xekong Power Plant Limited, a subsidiary of Phonesack Group, located in Southern Laos, specifically in Saravan Province, approximately 800 km south of Vientiane Capital.
Services Provided:
ESL provided consulting services for the Mine Closure Plan with the following scope of services:
Mine Closure Design and Estimation:
- In coordination with XPPL Mine Teams, ESL reviewed all provided information, conducted a site visit, and carried out the mine closure design and closure cost estimation.
- Prepared the Mine Closure Plan report as required by the Government of Laos (GoL).
Draft Submission and Consultation:
- Provided a draft of the Mine Closure Plan document to XPPL for review and consultation with the GoL before issuing the final document.
Document Revision:
- Made adjustments or changes to the document based on feedback from XPPL following consultation and review by the GoL.
Final Submission:
- Submitted the final Mine Closure Plan document to XPPL as per the agreed submission schedule.