Resettlement and Compensation input for the Upgrading the Lao Asian Highway Road Number 8

Environmental Impact Review and inventory of loss survey for Detailed Feasibility Study for Upgrading National Road No.8 on the Asian Highway (AHI5) Network in the Lao PDR.

Client

Dongsung Engineering/Dongil/Dasan Consultants

 

Location

Bolikhamxay and Khammouan Provinces, Lao PDR.

 

Project Duration

October 2017 – July 2018

 

Background

The Upgrading National Road No 8 (NR-8), in other name the Asian Highway (AH15) Network in Lao PDR, or the Project is located in Bolikhamxay and some part of Khammouan province with the total length of 130.3 km from Vieng Kham – Lak Sao and Nam Phao (Vietnam border). The Project Implementing Agency is Korea International Cooperation Agency (KOICA) with collaboration of Ministry of Public Works and Transport of Lao PDR (MPWT).

 

Services Provided

ESL provided the Environmental Impact Review during the design of the Project. (This EIR serves different objectives from the Initial Environmental Examination (IEE) or Environmental Impact Assessment (EIA) which in this case it requires simple approaches on impact assessment for environment components of the Project. Scope of the study includes the following:

  • Regulations reviews;
  • Basic information on physical component, biological component and social component;
  • Impact identification and assessment;
  • Recommendation to the detail design.

Water sampling at Hinboun River

Air quality monitoring

Meeting with Provincial

Village discussion

ใส่ความเห็น